道岔施工方案
发布时间:2021-06-08
发布时间:2021-06-08
客运线路插铺道岔施工方案
目 录
1、编制依据 ················································································································· 1
2、概述 ________________________________________________________________ 1
2.1、工程概况 __________________________________________________________ 1
2.2、工程特点及难点 ____________________________________________________ 2
2.3、总体施工方案及施工组织 ____________________________________________ 2
2.4
、总体施工方案
3
3.1、前期工作
3.2、封锁前准备 ________________________________________________________ 8
3.3、封锁施工方案、措施 _______________________________________________ 11
4、主要技术标准及施工工艺 ··················································································· 22
4.1、道岔预铺 _________________________________________________________ 22
4.2、正位铺设道岔 _____________________________________________________ 22
4.3、道岔拨移 _________________________________________________________ 26
4.4、无缝线路焊接 _____________________________________________________ 27
4.5、无缝线路应力放散及锁定 ___________________________________________ 28
4.6、插铺施工注意事项 _________________________________________________ 29
5.施工组织 ················································································································· 30
6、质量保证措施 ······································································································· 31
6.1、质量目标 _________________________________________________________ 31
6.2、质量保证体系 _____________________________________________________ 31
7、安全保证措施 ······································································································· 33
7.1、营业线作业安全防护 _______________________________________________ 35
7.2、施工期间具体防护 _________________________________________________ 35