AEC_Q100_Rev_G_Base_Document(16)
时间:2025-05-03
时间:2025-05-03
车用电子产品的执行标准。
TEST GROUP C – PACKAGE ASSEMBLY INTEGRITY TESTS
# NOTES ADDITIONAL REQUIREMENTS SAMPLE SIZE / LOT NUMBER OF LOTS ACCEPT CRITERIA TEST METHOD
STRESS ABV
Wire Bond Shear WBS C1
H, P, D, G CPK >1.33 PPk >1.67 AEC Q100-001 At appropriate time interval for each bonder to be used.
30 bonds from a minimum of 5 devices
Wire Bond Pull WBP C2
H, P, D, G
CPK >1.33 PPk >1.67 or 0 Fails after TC (test #A4) MIL-STD883 Method 2011
Condition C or D. inimum pull strength after TC = 3 grams. bond pull shall be performed with the hook
Component Technical Committee
Solderability SD C3
H, P, D, G
15 1
>95% lead coverage
JEDEC JESD22-B102
If burn-in screening is normally performed on the device before shipment, samples for SD must first undergo burn-in. Perform 8 hour steam aging prior to testing (1 hour for Au-plated leads).
Automotive Electronics Council
Table 2: Qualification Test Methods (continued)
Page 13 of 32
C4
H, P, B, D, G
Physical Dimensions 10 3
CPK >1.33 PPK >1.67
PD
JEDEC JESD22-B100 and B108
See applicable JEDEC standard outline and individual device spec for significant dimensions and tolerances.
Solder Ball Shear
B SBS C5
5 balls from a min. of 10 devices
3
CPK >1.33 PPK >1.67 AEC Q100-010 PC thermally (two 220ºC reflow cycles) before integrity (mechanical) testing.
Lead Integrity LI C6
H, P, D, G
10 leads from each of 5 parts
1
No lead breakage or cracks JEDEC JESD22-B105
Not required for surface mount devices. Only required for through-hole devices.
TEST GROUP D – DIE FABRICATION RELIABILITY TESTS
# NOTES SAMPLE SIZE / LOT NUMBER OF LOTS ACCEPT CRITERIA TEST METHOD ADDITIONAL REQUIREMENTS
STRESS
ABV
Electromigration EM D1 --- --- ---
---
---
The data, test method, calculations and internal criteria should be available to the user upon request for new technologies.
AEC - Q100 - REV-G
May 14, 2007
Time Dependent Dielectric Breakdown D2
TDDB --- --- --- --- ---
The data, test method, calculations and internal criteria should be available to the user upon request for new technologies.
…… 此处隐藏:18字,全部文档内容请下载后查看。喜欢就下载吧 ……上一篇:工作检查流程(1)
下一篇:春季皮衣服饰色彩搭配法