PMP考试模拟题(683个)-v2(20)

发布时间:2021-06-08

PMP需要参考

222222251QUESTResource leveling will often affect the project by making it:51AShorter.51BLonger51CMore responsive to customer needs.51DA and C51EB and C.51

QUESTA plan has budgeted three weeks of effort for consultants, but the job was done in only two weeks.

B

252

Calculate the variance:252A1.50%252B33.00%252C75%252D67%252ENone of the above.252

QUESTOn November 1, $1000 worth of work on task A was supposed to have been done (BCWS);

253

however, the BCWP was $850. Calculate the schedule variance:253A¥-100253B¥100253C¥-150253D¥150253E85%253

254QUESTThe purpose of a dummy activity in an activity-on-arrow diagram is to:254AIdentify a task that could be replaced by another.254BTake the slack time into account.254CShow a task that is not necessarily needed.254DDenote a milestone.254EShow a dependency relationship.254

QUESTAs a project is carried out and slack time is consumed on individual tasks, the slack left over for

255

the remaining tasks is:255AInsignificant.255BReduced.255CUnchanged.255DIncreased.255EDoubled.255

256QUESTFast tracking means to:256ASpeed up a project through parallel tasks.256BSwap one task for another.256CReduce the number of tasks if possible.256DB and C.256ENone of the above.256

257QUESTThe key purpose of project control is to:257APlan ahead for uncertainties.257BGenerate status reports.257CKeep the project on track.257DDevelop the project road map.257EAll of the above.257

258QUESTExcessive flexibility in specifying requirements will _____ the likelihood of time overruns.258AReduce.258BEliminate.258CDouble

B

C

E

C

A

C

PMP考试模拟题(683个)-v2(20).doc 将本文的Word文档下载到电脑

精彩图片

热门精选

大家正在看

× 游客快捷下载通道(下载后可以自由复制和排版)

限时特价:7 元/份 原价:20元

支付方式:

开通VIP包月会员 特价:29元/月

注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信:fanwen365 QQ:370150219