技术报告-尾矿库设计及评估 (英文)(4)

发布时间:2021-06-07

技术报告-尾矿库设计及评估 (英文)

Design and Evaluation of Tailings Dams

5.2.1 Seepage Flow (Direction and Quantity) .................................... 44

5.2.2 Seepage Quality ...................................................... 44

5.2.3 Seepage Control ...................................................... 45

5.3 Tailings Water Treatment ....................................................... 48

6. CASE STUDY: STILLWATER MINING COMPANY TAILINGS IMPOUNDMENT ......... 49

6.1 Site Evaluation, Field Exploration and Laboratory Tests ............................... 50

6.1.1 Site Evaluation ....................................................... 50

6.1.2 Field Exploration ..................................................... 50

6.1.3 Laboratory Tests ..................................................... 51

6.2 Office Evaluations ............................................................. 52

6.2.1 Hydrology Evaluation ................................................. 52

6.3 Tailings Impoundment Design ................................................... 54

7. REFERENCES ................................................................... 56

LIST OF TABLESTable 1. Comparison of Embankment Types ............................................. 24

Table 2. Stillwater Mining Company Calculated Design Floods .............................. 53

LIST OF FIGURESFigure 1. Water-Retention Type Dam for Tailings Disposal ................................. 6

Figure 2. Embankment Types: (a) Upstream, (b) Centerline, (c) Downstream or Water Retention

Type ..................................................................... 7

Figure 3. Single (a) and Multiple (b) Cross-Valley Impoundments ............................ 9

Figure 4. Single (a) and Multiple (b) Side-Hill Impoundments ............................... 10

Figure 5. Single (a) and Multiple (b) Valley-Bottom Impoundments .......................... 12

Figure 6. Single (a) and Segmented (b) Ring-Dike Impoundment Configurations ................ 13

Figure 7. Phreatic Surface Through a Tailings Impoundment ................................ 16

Figure 8. Upstream Tailings Embankment Construction .................................... 25

Figure 9. Downstream Embankment Construction ........................................ 27

Figure 10. Centerline Embankment Construction .......................................... 29

Figure 11. Examples of Tailings Embankment Flow Nets .................................... 36

技术报告-尾矿库设计及评估 (英文)(4).doc 将本文的Word文档下载到电脑

精彩图片

热门精选

大家正在看

× 游客快捷下载通道(下载后可以自由复制和排版)

限时特价:7 元/份 原价:20元

支付方式:

开通VIP包月会员 特价:29元/月

注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信:fanwen365 QQ:370150219