Design and Evaluation of Tailings Dams
Site independence benefits the design, since less effort and cost are needed to counteract topographic
obstacles, soil conditions, climatic conditions, and construction obstacles. The uniform layout, shape, and
flat terrain prevents surface runoff from entering the impoundment and decreases the requirements for flood
control measures.
3.TAILINGS IMPOUNDMENT DESIGN
The actual design of a tailings dam and impoundment occurs only after the site has been selected. However,
the site selection and design are best considered to be a dynamic process. A number of design principles
should affect the site selection process as well as the determination of the embankment type and the
impoundment configuration. This section first describes some of these fundamental design principles as well
as major design variables and site-specific factors that influence ultimate design. As noted previously, the
major considerations in the design of a tailings dam and impoundment are stability, cost, and environmental
performance.
3.1Basic Design Concepts
In general, tailings impoundments (and the embankments that confine them) are designed using information
on tailings characteristics, available construction materials, site specific factors (such as topography, geology,
hydrology and seismicity) and costs, with dynamic interplay between these factors influencing the location (or
siting) and actual design of the impoundment. Because water is a major component in any tailings
impoundment system, principles of hydrology (applied to flow of water through and around the tailings
embankment) dictate many of the rules of tailings impoundment design. Indeed, because impoundment and
dam stability are in large part a function of the water level, these principles are of fundamental concern in the
design of any tailings impoundment.
One of the basic principles used in the design of impoundments and their embankments is the maintenance of
the phreatic surface within the embankment. The phreatic surface is the level of saturation in the
impoundment and embankment (the surface along which pressure in the fluid equals atmospheric pressure
(CANMET 1977)); in natural systems it is often called the water table. The phreatic surface exerts a large
degree of control over the stability of the embankment, under both static and seismic loading conditions (Vick
1990). The major design precept is that the phreatic surface should not emerge from the embankment and
should be as low as possible near the embankment face (Vick 1990). This basically maintains a pore
pressure at the face of the embankment lower than atmospheric pressure plus the weight of the embankment
particles and maintains the face of the dam. Thus any factors that might affect the phreatic surface in the
embankment may also affect stability of the embankment. The primary method of maintaining a low phreatic
surface near the embankment face is to increase the relative permeability (or hydraulic conductivity, since
water is the fluid) of the embankment in the direction of flow. (See Figure 7.)