automotiveSIG_PRM_v45(5)

时间:2026-01-15

spice规范V4.5

Document History

Version: Date:

4.0

4.1

4.2

4.3

4.4

4.5 2005-05-02 2005-06-24 2005-08-21 2007-05-05 2008-08-01 2010-05-08 By: AD AD AD AD AD AD Notes: DRAFT RELEASE pending final editorial review Editorial review comments implemented Final checks implemented FORMAL RELEASE Revision following CCB FORMAL RELEASE Revision following CCB FORMAL RELEASE Revision following CCB

FORMAL RELEASE

Release Notes

Version 4.5 of the Process Reference Model incorporates changes regarding

emphasising the use of this document in conjunction with the terminology in ISO/IEC 15504-1

significant editorial changes to the Software construction process (ENG.6)

registered trademark notice.

Version 4.5 of the Process Reference Model replaces version 4.4 of the

Process Reference Model with immediate effect.

Version 2.5 of the Process Assessment Model has been released at the same time and is aligned with Version 4.5 of the Process Reference Model.

Any problems or change requests should be reported through the defined

mechanism at the web site. These will be

addressed by the Change Control Board which meets every 6 months.

automotiveSIG_PRM_v45(5).doc 将本文的Word文档下载到电脑

精彩图片

热门精选

大家正在看

× 游客快捷下载通道(下载后可以自由复制和排版)

限时特价:4.9 元/份 原价:20元

支付方式:

开通VIP包月会员 特价:19元/月

注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信:fanwen365 QQ:370150219