automotiveSIG_PRM_v45(13)

时间:2026-01-15

spice规范V4.5

Table 2 — Primary Life Cycle Processes – SPL process group Process

Identification

SPL.1

SPL.2 PRM Process name Supplier tendering Product release Source ISO/IEC 12207 Amd.2 (§F1.2.1) ISO/IEC 12207 Amd.2 (§F1.2.3)

The Engineering process group (ENG) consists of processes that directly elicit and manage the customer's requirements, specify, implement, or maintain the software product, its relation to the system.

Table 3 — Primary Life Cycle Processes – ENG process group Process

Identification

ENG.1

ENG.2

ENG.3

ENG.4

ENG.5

ENG.6

ENG.7

ENG.8

ENG.9

ENG.10 PRM Process name Requirement elicitation System requirements analysis System architectural design Software requirements analysis Software design Software construction Software integration test Software testing System integration test System testing Source ISO/IEC 12207 Amd.1 (Annex F; §F.1.3.1) ISO/IEC 12207 Amd.1 (Annex F; §F.1.3.2) ISO/IEC 12207 Amd.1 (Annex F; §F.1.3.3) ISO/IEC 12207 Amd.1 (Annex F; §F.1.3.4) ISO/IEC 12207 Amd.1 (Annex F; §F.1.3.5) ISO/IEC 12207 Amd.1 (Annex F; §F.1.3.6) ISO/IEC 12207 Amd.1 (Annex F; §F.1.3.7) ISO/IEC 12207 Amd.1 (Annex F; §F.1.3.8) ISO/IEC 12207 Amd.1 (Annex F; §F.1.3.9) ISO/IEC 12207 Amd.1 (Annex F;

§F.1.3.10)

automotiveSIG_PRM_v45(13).doc 将本文的Word文档下载到电脑

精彩图片

热门精选

大家正在看

× 游客快捷下载通道(下载后可以自由复制和排版)

限时特价:4.9 元/份 原价:20元

支付方式:

开通VIP包月会员 特价:19元/月

注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信:fanwen365 QQ:370150219