闭式水系统调试作业指导书(英)(2)

时间:2025-07-08

英文版的闭式水系统调试作业指导书

1 Objective

1.1 In order to instruct and control the commission work of system and equipments so as to guarantee the system and equipment can be put into operation safety and normally, this commissioning procedure is prepared.

1.2 Check the Electrical, C& I signal devices and interlock protection according to this commissioning procedure and make sure the indication is correct and action is reliable.

1.3 Check the running condition of the equipment and system according to this commissioning procedures, check the performance of the system so that the possible defectives can be removed.

1.4 This procedure is an introduction document. Commission engineer can modify the contents, which are not proper for site situation. As long as the commission purpose is reached and function at performance of turbine generator unit is checked to meet the requirement of design and operation, then all reasonable test, check, measure and operation method and steps are allowed.

2 Description to system and main equipment technical specification

Closed circulation cooling water pump

Type: KQSN300-N13/303

Flow: 550t/h

Head: 40m

Motor power: 55KW

Voltage: 400V

3 Commission range

Closed circulation cooling water system consists of closed water expansion

tank, closed water pump, turbine side water-water exchanger, coolers, valves, indication instruments of closed circulation cooling water. Water source is provided by chemical water or condensate water. The primary cooling water of closed circulation cooling water system adopts chemical DM water, secondary

闭式水系统调试作业指导书(英)(2).doc 将本文的Word文档下载到电脑

精彩图片

热门精选

大家正在看

× 游客快捷下载通道(下载后可以自由复制和排版)

限时特价:7 元/份 原价:20元

支付方式:

开通VIP包月会员 特价:29元/月

注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信:fanwen365 QQ:370150219