Phase2_SIP_Explanation_Submission_Latest(6)
时间:2026-01-19
时间:2026-01-19
ipv6 ready 测试文档
3. About the Submission
3.1 The List of the Submission
These files that are shown in Table 3-1 are necessary to submit for obtaining the SIP IPv6 Ready Logo Phase-2.
Table 3-1 The list of the submission
Application Form Conformance test
Configuration file Test tool
Interoperability Test Result Table test
Topology Map Test log
Application Form
Explanation
Application Phase-2.
The HTML log generated when conformance test was executed.
The config.txt set up when conformance test was executed.
conformance test was executed.
The sheet that describes the information of test results in interoperability test.
The sheet that describes the information of interoperability test was executed.
Packet Capture File
The detail of each submission is described in the following subsections. Also, the directory structure is described in subsection 3.5.
interoperability test was executed.
上一篇:MT4外汇交易平台用户指南
下一篇:走在药物发现前沿的高内涵药物筛选