D市多水源供水管网系统水源事故时优化调度研究(5)

发布时间:2021-06-07

哈尔滨工业大学硕士学位论文

Abstract

The urban water distribution system(WDS) is an important city infrastructure,which plays an irreplaceable role in people's lives and social production. With the economic and social development,the safety of water supply is given more attention. However, the growing conditions of water pollution and many other uncertainties, lead to sudden water source pollution accidents occurred frequently, which has posed a severe challenge to the safety and reliability of water supply system. To improve the safety and reliability of water supplying,using muti-source water distribution systems become a trend. For sudden water source pollution accidents, many districts developed a number of contingency plans of measures. Among them, The active optimal operation of muti-source wter distribution system with water source sudden polluted is an important measure.

In the traditional water supply network hydraulic model, the water flow of nodes is given by water demand,and is constant,so the traditional hydraulic model is difficult to simulate the water shortage conditions with water source polluted. For the shortcomings of the traditional hydraulic model,from the view of water flow of nodes, the water flow of nodes is divided into two parts of water actual consumption and leakage.Then the two parts are established with the relation of water pressure of nodes,and then the water supply network hydraulic model is constructed,which could simulate the conditions of water shortage condition. Combined the model, the expression of water supply meet rate is given under water source polluted, and the evaluation of water distribution system failure degree is developed using the comprehensive evaluation method. Though sollution analysis of an example network, it was found that this water supply network hydraulic model not only simulate the normal operation conditions accurately,but also is well capable of simulating the water inadequation condition with one water source polluted.

For optimal scheduling of water distribution system with water source sudden polluted, three scheduling objectives proposed: (1)increasing the water supply meet rate of the key users in key periods, (2) reducing the leakage and increasing water consumption in the pipe network,(3) reducing pump operating costs. Taking the open state and the speed ratio of pump in each period as decision variables,the optimal scheduling model of water distribution system with water source polluted is constructed,and the model is solved by non-dominated sorting genetic algorithm.

With the status of muti-source water distribution system of D city in North China,

D市多水源供水管网系统水源事故时优化调度研究(5).doc 将本文的Word文档下载到电脑

上一篇:听课记录表

下一篇:发改委2007年670号文

精彩图片

热门精选

大家正在看

× 游客快捷下载通道(下载后可以自由复制和排版)

限时特价:7 元/份 原价:20元

支付方式:

开通VIP包月会员 特价:29元/月

注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信:fanwen365 QQ:370150219