大学英语 第三版 第三册 听力原文及答案1(17)

时间:2026-01-18

B.

C.

She wants to ask for a loan from Tim's bank. She wants Tim to be her financial consultant. The Olympic Park

To host the 29th Summer Olympic Games in 2008, Beijing needs 35

stadiums in all. Thirty of them will be in Beijing, with 15 of them newly built. The first on the list is the building of the Olympic Park or "Olympic Green." The Olympic Green will be located at the northern tip of central Beijing, to the north of downtown area and to the east of a district famous for science, education and historical buildings. Covering a total area of 1,215 hectares, the Olympic Green consists of 760 hectares of woods and grassland, a 50-hectare Chinese Nationalities Museum and a 405-hectare International Exhibition and Sports Center. The Olympic Green will become a state-of-the-art center of cultural, recreational and sports activities in Beijing.

The Olympic Green also has an area of sports venues. In the area, an

80,000-seat main stadium and 15 other sports venues are now under construction. When completed, they will be able to host 12 major sports competitions at the same time, including track and field events. The International Exhibition and Sports Center will also be built in this area.

The design of the Olympic Green has taken serious considerations about how to meet IOC's standards of environmental protection. It uses materials that are environment-friendly and equipment that needs less energy to run so as to protect the environment. All this will help the Beijing Olympic Games to be remembered as the greenest Olympics.

TIPSPLAY 文中提到,北京为准备2008年奥运会将兴建15个运动场。

1. How many stadiums need to be built in Beijing for the 29th Summer Olympic Games?

C

1.

A.

B.

C. 35. 30. 15.

大学英语 第三版 第三册 听力原文及答案1(17).doc 将本文的Word文档下载到电脑

精彩图片

热门精选

大家正在看

× 游客快捷下载通道(下载后可以自由复制和排版)

限时特价:4.9 元/份 原价:20元

支付方式:

开通VIP包月会员 特价:19元/月

注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信:fanwen365 QQ:370150219