ABB-Substation-Condition-Monitoring-Schedule(6)

时间:2025-04-20

Check for bird/ animal nests or other foreign materials in the vicinity of energized equipment, buses or fans.

Observe the general condition of the substation yard, overall cleanliness

Observe the position of all circuit breakers in the auxiliary power system and verify the correctness of this position (indication on breaker).

Inspect the area for weed growth, trash and unauthorized equipment storage.

Ensure the fence fabric is intact and there is no rust.Ensure the gate latches are operable

Ensure flexible braid-type connections are intact.