Battery and battery chargerCheck for any physical damage, loose connections. Check for low level or low specific gravity of the electrolyte. Record the electrolyte temperature. Verify vent cap and flame arresters are in place. Check electrolyte appearance. Check working of exhaust fan.Check for cleaning and corrosion.Observe temperature (by touch). If temperature is found high, check and attend the reason for the same. Check the charging current and voltage. Observe the ground detector lamps for an indication of an undesirable ground on the dc system. Compressor

Check for leakage of air. Check air pressure and Oil level. Substation area- General

Verify the existence of appropriate danger and informational warning signs. Verify whether they are missing or needs repainting.

Check for rusting of fasteners

Check for any hotspots at conductor/ equipment/ stringing termination.

Check for indoor and outdoor lighting systems for burned-out lamps or other component failures

Verify that there is adequate supply of sparesInspect the fire protection system

ABB-Substation-Condition-Monitoring-Schedule(5).doc 将本文的Word文档下载到电脑

精彩图片

热门精选

大家正在看

× 游客快捷下载通道(下载后可以自由复制和排版)

限时特价:7 元/份 原价:20元

支付方式:

开通VIP包月会员 特价:29元/月

注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信:fanwen365 QQ:370150219