IE(工业工程)在现场的改善步骤

IE(工业工程)在现场的改善步骤

改善步骤(IMPROVEMENT STEPS)

1. 请资材部提供最近两个月的欲生产产品计划 ( Take the forecast schedule form PC (2 months) and compare with Production schedule)

-确定量大的产品(Sort high models in the schedule)

2. 制定IE改善计划(Make IE improvement schedule )

-从生产排程中挑选量大、成本高的产品进行改善 (Select models to high order & cost from forecast schedule for improvement)

-改善的五个步骤(5 steps for improvement)

1观测(Observation)

2分析,BF&AF表单填写(Analyze , Before & After sheet) 3改善(Implement)

4改善效果追踪(Follow up)

5标准工时与作业指导书的修订(update Std time)

3. 观测流水线作业时间(Observation time in production line)

-每个工序测5个时间(Observe 5 times/Process)

-包含损失的时间(Not include lost time in observe time (C/T))

4.BF&AF表的制作( Before & After sheet)

这里分3个部分(There are 3 parts)

1.BF&AF表( Before & After)

-比较改善前(IE工时、观测时间)和改善后(计划改善工时、实际改善工时)

(Comparison between Before (IE,Observation)and After (Plan,Actual))

2. 关键指标汇总表(Summary)

IE(工业工程)在现场的改善步骤

-最大循环时间(C/T)

-生产线平衡率(Line balance efficiency)

-产出数量(Output)

-标准工时(Std time)

3. 绘制图表(Graph)

5. 改善汇总Summary improvement

所有改进后的产品关键数据汇总表(Summary all models after implement already) -标准工时(Std time)

-生产线平衡率(Line balance efficiency)

-产出数量(Output)

-人力(Man power)

6. 修订标准工时表(Update Std time sheet)

IE(工业工程)在现场的改善步骤.doc 将本文的Word文档下载到电脑

    精彩图片

    热门精选

    大家正在看

    × 游客快捷下载通道(下载后可以自由复制和排版)

    限时特价:4.9 元/份 原价:20元

    支付方式:

    开通VIP包月会员 特价:19元/月

    注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
    微信:fanwen365 QQ:370150219