Abstract

This open-pit exploitation and development design is applied to Damao Dong Yuan Iron Mine, with an annual output of approximately 1.7 million tons, the lowest level of mining is 1470 meters,the hight of step is 10 meters. Open-pit boundary is contoured with the application of the rule of boundary stripping ratio less than or equal to economic stripping ratio. And make a calculation of proved reserves and average stripping ratio. Throughput is verified by extension rate of the mine. When working out the open-pit excavation progress schedule, production stripping ratio is initially decided by the approach of average stripping ratio multiplied by coefficient while efficiency of electric shovel selected on the basis of similar mines.

The mine is exploited by vehicles along the slope of the spiral pit-line.

Techniques include the selection and calculation of drilling equipments, electric shovels, vehicles, bulldozer as well as assistant auxiliary equipments. Blasting method is the selection of dosage and calculation; shunting method is the selection as well as the selection of dumping and dumping calculation.

Keywords: open-pit mining; development; technology; excavation progress schedule

张丽的毕业设计说明书(3).doc 将本文的Word文档下载到电脑

精彩图片

热门精选

大家正在看

× 游客快捷下载通道(下载后可以自由复制和排版)

限时特价:7 元/份 原价:20元

支付方式:

开通VIP包月会员 特价:29元/月

注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信:fanwen365 QQ:370150219