变电站设计理工大学word版(2)
时间:2026-01-14
时间:2026-01-14
如不慎侵犯了你的权益,请联系我们告知!
With the development of economy and the improvement of people's living standard,the requirement of power quality is increasing. The country put forward to accelerate city net and rural power grid construction and transformation, stimulating domestic demand,development plan, city net and 110kV substation construction of the rapid development ofrural power network. Due to the construction site of geographical conditions of perplexingand other objective conditions, how to design the network of city and rural 110kV substation, is a national network of city and rural construction, transformation of the need to study and solve main task.Transformer substation is an important part of power system, and its reliability is closely related with the development of national economy. The design is the preliminary design of 110 kV transformer substation electrical part ,and draw main electrical one-line diagram. The 110 kV,35kV,10 kV and the main lines are determined by analyzing the concerning load data (including its security, economy and reliability). Meanwhile, the number, capacity and type of the main transformer are made certain through the load calculation . then, according to the results of calculating of the maximum work electric current and short circuits, high voltage breaker, isolator switches, current transformer, voltage transformer and bus-bar can be selected, and After designing lightning protection , the primary design of 110 kV electricity primary system is completed .Then,the conservation programme for the main transformer is made and the power distribution unit is designed.And the design of 110 kV electricity primary system is completed.
Keywords: substation; primary systerm; lightning protection; main transformer protection
上一篇:臭氧破坏和温室气体排放源清单
下一篇:注会-会计英语讲义