施工阶段工程项目的进度控制毕业论文

时间:2025-07-13

摘要

毕 业 论 文

论文题目

学院名称 专 业 姓 名 学 号 起讫日期 指导教师

施工阶段工程项目的进度控制

I

施工阶段工程项目的进度控制

摘 要

项目进度管理是工程项目管理的一项极为重要的工作,能全面反映项目的实施状况。做好施工阶段的进度控制管理对确保施工单位履行合同、工程按期竣工发挥着至关重要的作用。施工项目进度控制与投资控制和质量控制一样,是项目施工申的重点控制之一。它是保证施工项目按期完成,合理安排资源供应、节约工程成本的重要措施。但是,目前在建设项目管理中很难同时实现质量、成本和进度三大目标,本文即针对项目进度控制,从系统的角度出发,结合实际详细阐述了项目进度控制的管理过程。

关键词:项目进度控制 施工阶段 进度计划

Abstract

Construction engineering project schedule control

Abstract

The progress of the project management of engineering project management is a very important job, which can reflect the project implementation status. Do a good job in the construction phase of the progress control management to ensure the construction unit to perform the contract, the project completed on time plays a vital role in. Progress control of construction project investment control and quality control, is one of key control project construction claim. It is to ensure that the construction project completed on schedule, the reasonable arrangement of resources supply, save the cost of important measures. However, at present in the construction project management is difficult to simultaneously achieve the quality, cost and schedule three big targets, the article focuses on the project progress control, from the system point of view, combined with the actual detailed project schedule control of management process.

Key words:project schedule control;construction stage ;dynamic control

II

目录

目 录

摘 要 ························································································· II Abstract ························································································· II

第一章 引 言 ··············································································· 1

第二章 项目进度控制与进度计划系统 ·················································· 2

2.1 项目进度控制 ························································································ 2

2.1.1 项目进度控制的特点 ······································································· 2

2.1.2 项目进度动态控制 ·········································································· 3

2.2 项目进度控制的目的 ··············································&# …… 此处隐藏:5879字,全部文档内容请下载后查看。喜欢就下载吧 ……

施工阶段工程项目的进度控制毕业论文.doc 将本文的Word文档下载到电脑

    精彩图片

    热门精选

    大家正在看

    × 游客快捷下载通道(下载后可以自由复制和排版)

    限时特价:7 元/份 原价:20元

    支付方式:

    开通VIP包月会员 特价:29元/月

    注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
    微信:fanwen365 QQ:370150219