汽车开发项目常用英语缩写对照(9)
时间:2025-05-02
时间:2025-05-02
Interface Control Document
Industrial Engineering
International Export Market Analysis
Indirect Labor Reporting System
International Operations
International Product Center
Incidents Per Thousand Vehicles
Initial Quality Survey
Incident Report
Integrated Scheduling Project
Integrated Training Process
Interior Technical Specification Drawing
International Uniform Vehicle Audit
Key Control Characteristics
Key Characteristics Designation System
Kick-off Meeting
Key product Characteristic
Ling Lead P Release
Letter of Intent
Machine & Equipment
Master Datum Drawings
Metal Fabrication Division
Manufacturing Operations
Marketing Information Center
Manufacturing Integration Engineer
Marketing
Material Labor Balance System
Manufacturing Major Subsystem Technical SpecificationsManufacturing Engineering
Milford Proving Ground
Master Process Index
Master Parts List
Material Planning System
Material Required Date
Material Required Date
Material Safery Data Sheets
Manufacturing System Engineer
Market Segment Specification
Mean Time Between Failures
Manufacturing Technical Specification
Motor Vehicle Safety Standards
North American Market Analysis
North American Operations
NAO Containerization
Numerically Controlled
Next Generation Math-Based Process
Notice of Authorization
NAO Strategy Board
Organization and Employee Development