The Republic Of The Union Of Myanmar

Ministry of Electric Power Myanma Electric Power Enterprise

Power System Development Scheme of MEPE

Location - Naypyitaw Date -2.7.2013

缅甸电力市场发展介绍

2

Contents About Our Country

Current Situation in Myanma Power System Upgrading Plan for the System (5 Years Plan)

Conclusion Question and Answer

缅甸电力市场发展介绍

缅甸电力市场发展介绍

4

Brief Introduction to The Republic of Union of MyanmarArea of CountryPopulation

261, 229.73 sq-mile(677,000 km2)around 59.78 million(as of 2011)Sagaing

Kachin

The country consists ofStates (1) Kachin (2) Kayah Regions (1) Sagaing (2) TanintharyiRakhaingChin Mandalay

Shan

MagwayBago

Kayar

(3) Kayin (4) Chin (5) Mon (6) Rakhaing(7) Shan

(3) Bago (4) Magway (5) Mandalay (6) Yangon(7) Ayeyarwaddy

Ayeyarwaddy

Yangon

Kayin

Mon

Tanintharyi

缅甸电力市场发展介绍

Main facts abstract from Geography of Myanmar1} According to the land form and climate of Myanmar, there are rich hydro power resources in Northern and Eastern Regions of Myanmar. There are more than 15 Hydro Power Resources which were the capacity>1000MW in that regions.

5

Mandalay

2) Myanmar have the border with the China, India and Thailand. Therefore the power trade to these country can be achieved. 3) Yangon is the most populated region and it has about 7 millions peoples. Yangon has the main sea port and Industry Zones. Therefore, Yangon is the biggest load center of Myanmar. Mandalay, Naypyitaw and Ayeyarwaddy regions are also have the high population density and the power demand is increasing rapidly.

Naypyitaw

Yangon

缅甸电力市场发展介绍

缅甸电力市场发展介绍

7

Background History for Power System The voltage levels of the Myanmar electrical power system are– 500 kV– 230 kV– 132 kV– 66 kV– 33 kV– 11 kV. The national grid has no direct connections to other grids of neighboring countries. The network comprises 44 overhead lines at 230 kV with a total length of 3979 km 41 overhead lines at 132 kV with a total length of 2334 km 100 overhead lines at 66 kV with a total length of 3729 km 11 overhead lines at 33 kV having a total length of 27 km. The 230 kV and 132 kV overhead lines are interconnecting approximately 69 substations. The above details are valid for the transmission system only and do not include the distribution network.

缅甸电力市场发展介绍

Location of Power Station within Myanma Power SystemThapanzeik 30 MW

Dapein(1) 240MW

8

Shweli(1) 600MWSedawgyi 25 MW Yeywa 790 MW

29,51%

3,56%Kyungchaung 54.3 MW

66,93%

Kinda 56 MW

Zawgyi(2) 12 MW

Zawgyi(1) 18 MW Tigyit Keng Taung 54 MW 120 MW

Hydro

Gas

Coal

Mann 36.9 MW Kyeeon Kyeewa 74 MW

Mone 75 MW

Paunglaung Baluchaung(1) 28 MW 280 MW

Sr

Description

Qty

Installed Capacity (MW)

Myanma Power System

Foreign

1 2 3

Hydropower Gas-fired Coal-firedTotal

20 14 135

2,780.0 996.05 120.03,896.05

2,259.0 996.05 120.03,375.05

521 521

Baluchaung(2) Shwedaung Kabau ng 168 MW 55.35MW 30MW Thauk-yeHydropower plant khat(2) Kun Gas-fired power plant 120 MW Myanaun 60 MW g Coal

-fired power plant 34.7MW Yenwe Shwegy Steam turbine power plant 25 MW in Zaungt 75 MW u Hlawga 154.2 MW 20 MW 54.55 MW Ywama Thaketa Thaton 70.3 MW 92 MW 50.95 MW 52 MW 53.6 MW Ahlone Mawlamyain 154.2 MW g 121 MW 12 MW 8

缅甸电力市场发展介绍

Power Stations in Myanmar (as of Dec’ 2012)Existing Power Station (Hydro, Gas-fired and Coal-fired Thermal) Hydropower Output (MW)

9Output (MW)54.3 36.9

Gas-fired1 2 Kyungchaung Mann

12 3 4 5

Baluchaung -1Baluchaung -2 Yeywa Kinda Sedawgyi

28168 790 56 25

34

ShwedaungMawlamyaing

55.3512

56 7

MyanaungHlawga Ywama

34.7154.2+54.55=208.75 70.3+52=122.3

67 8 9 10

Zawgyi -1Zawgyi -2 Thapanzeik Mone Paunglaung

1812 30 75 280

89

AhloneThaketa

154.2+121=275.292+53.6=145.6

10

ThatonSubtotal

50.95996.05

1112

KabaungYenwe

3025

Coal-fired1 Tigyit

Output (MW)120

1314 15

ZaungtuShweli -1 Keng taung

20600(300) 54

1617

ShwegyinKun

7560

1819 20

Kyeeon KyeewaDapein-1 Thauk-ye-khat(2)

74240(221) 120

Existing Power System Total= 3,896.05(3375.05)MW

Subtotal

2780(521)

Note: Output in parentheses is power supply to Myanmar from JV Projects.

缅甸电力市场发展介绍

Power Supply Status of Myanmar in 2012 (Dry and Rainy Season)

10

Dry season: 1,298 MW (May 18, 2012/10:00)

Rainy season: 1,796 MW

(October 18, 2012/20:00)

(Maximum power supply as of December 31, 2012)

缅甸电力市场发展介绍

11

Monthly Generation in GWh (2009 to 2012)Month Janurary Februrary March Apri May Jun July August Setember October November December Total 2009 509 471 528 508 516 522 607 672 651 672 601 573 6830 2010 520 485 568 562 538 568 723 767 767 774 773 765 7810 2011 771 722 819 795 824 829 888 892 860 892 869 873 10034 2012 856 840 910 824 792 843 945 950 950 981 974 939 10804

缅甸电力市场发展介绍

1000

100

200

600

700

800

900

300

400

500

0

Janurary771 856 471485

509520

Februrary

722568

840819

March 508

528

910

Apri

562

795 824516538

Monthly Generation i …… 此处隐藏:8087字,全部文档内容请下载后查看。喜欢就下载吧 ……

缅甸电力市场发展介绍.doc 将本文的Word文档下载到电脑

    上一篇:截止阀图例

    下一篇:学生美术作品标签

    精彩图片

    热门精选

    大家正在看

    × 游客快捷下载通道(下载后可以自由复制和排版)

    限时特价:7 元/份 原价:20元

    支付方式:

    开通VIP包月会员 特价:29元/月

    注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
    微信:fanwen365 QQ:370150219