建筑工程施工阶段的成本控制措施

发布时间:2021-06-07

龙源期刊网

建筑工程施工阶段的成本控制措施

作者:孙亚杰

来源:《城市建设理论研究》2013年第21期

摘要:对建筑工程而言,要想赢得较高的利润就要在一定报价的前提下控制好成本。在建筑工程当中投入成本最多的阶段就是在施工阶段,因此做好施工阶段的成本控制,可以很好地管理整个建筑工程中的成本投入。只有控制好施工成本,才能在众多的建筑企业竞争中赢得有利的地位。本文主要是通过对于施工阶段的深入分析并总结前人经验,对建筑施工阶段有关成本控制的原因、方法、措施等进行了分析和讨论。

关键字:建筑工程;施工阶段;成本控制

Abstract: the construction project is concerned, to gain higher profits will control the cost in the premise of a certain price. Input costs up to the stage in the construction of the project is in the stage of construction, so do the construction stage of cost control, can be a very good management of the entire construction project cost. Only good construction cost control, in order to win a favorable position in the competition of construction enterprise. This paper is mainly through the in-depth analysis of the construction phase and to summarize the experiences of predecessors, on the construction stage, the reasons of cost control methods, measures are analysed and

discussed.Keywords: construction project; construction stage; cost control

中图分类号:TU71 英文标识码:A

随着社会的不断进步和发展,各个行业的竞争都在不断加剧。如何才能在这种激烈的竞争中立于不败之地,是每一个企业所梦寐以求的。现代社会发展迅速,建筑行业也在不断地进步。各种的设备、技术、人才在不断地更新投入。要想在这样的环境下赢得利润就要全过程控制建筑施工成本,但如果建筑成本控制体系不够完整,或者是使用了错误的方法,那么不仅不会带来效益。反而会是整个企业落得亏损甚至破败的下场。这样就会使得企业的长远发展受阻。因此在建筑施工阶段的成本控制是至关重要的。

1 施工阶段成本控制概述

施工阶段的成本是以各工程项目的投入为主体,加上在施工过程中劳动者的劳动价值,再加上各种事务所消耗的货币等的总和。按照经济学上分类,施工阶段的工程成本可以分为直接成本和间接成本。其中,直接成本是由施工过程中的人工费用、材料费用、机械使用费用和其他直接需要的货币费用等各种费用组合而成的。而间接成本则是企业内部为了整个工程的管理以及组织时所使用的全部费用。在间接费用中包含了管理该工程的人员的各种工资、福利等费用还有工程施工阶段各种仪器等固定资产的折旧费用、修理资金等,以及在施工阶段的各种水费、电费等,还有各种保险费。

建筑工程施工阶段的成本控制措施.doc 将本文的Word文档下载到电脑

    精彩图片

    热门精选

    大家正在看

    × 游客快捷下载通道(下载后可以自由复制和排版)

    限时特价:7 元/份 原价:20元

    支付方式:

    开通VIP包月会员 特价:29元/月

    注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
    微信:fanwen365 QQ:370150219