N23-LE-CQ3-CM-011 房建工程施工方案
时间:2025-07-15
时间:2025-07-15
Contents
目录
Project overview
一、工程概况.........................................................1-3 Fabrication reference
二、编制依据.........................................................3-3 Construction principle
三、施工准备.........................................................3-3 Housing construction engineering construction process
四、房建工程施工流程..............................................4-9
Housing construction engineering process and construction methods
五、房建工程施工工艺及施工方法...........................................9-13 Safety attentions
六、安全注意事项....................................................16-16
一、Project Overview工程概况
This project is Linde Huayi(Chongqing) Gases Co., Ltd 1 Billion Nm3/year Syngas CO/H2 project,
located in Chongqing(Changshou) Chemical Industry Park, and the main work contains substation、office、parts stock、compression unit 、power absorption unit、washing unit、raw material gas compressor unit 、high temperature shift unit etc..
本项目为林德化医(重庆)气体有限公司10 亿Nm3/年合成气制备CO/H2 项目,位于重庆(长寿)化工园区内, 其中主体工作包括变电所、办公楼、备件仓库、压缩单元、变电吸附单元、洗涤单元、原料气压缩单元、高温变换单元等。
This project covers complex building, spare parts store, substation works; the complex building and
substation are of concrete framework structure and with three floors, building height of complex building is 11.5m, the height of substation is 13.8m, spare parts store is made of reinforced concrete posts and light steel frame, single floor, the height of floor is 6.3m. Because the construction room is very narrow: adjacent to the works there is no available site space, only narrow and long zone can be used as temporary material transfer site, the difficulty during construction will be great. In order to ensure the construction safety、quality、 high efficiency and especially the preparation of the scheme.
本工程房建项目包括综合楼、备件仓库和变电所工程,综合楼和变电所均为结构为混凝土框架结构,层数为三层,综合楼建筑高度为11.5m,变电所建筑高度为13.8m,备件仓库为钢筋混凝土柱,轻钢屋顶,单层,层高为6.3m。因施工场地狭小:工程邻近无可利用的场地,可供利用的场地很少,仅狭小的区域能利用作为临时中转材料的场地,故在施工中的困难较大。为保证施工安全、优质、高效完成,特编制本方案。
二、Fabrication reference编制依据
Design drawings for this project本工程项目设计图文件
Groundsill investigation report地基勘察报告
《Building’s groundsill and foundation construction & acceptance code》
《建筑地基与基础施工及验收规范》.........................................(GBJ202-2002) 《Project’s survey norm》
《工程测量规范》........................................................(GB50026-2007) 《Brickwork’s quality acceptance code》
《砌体工程施工质量验收规范》............................................(GB50203-2002) 《Concrete structure works’ quality and acceptance》
《混凝土结构工程施工质量验收规范》......................................(GB50204-2002) 《Reinforced steel bars’ welding and acceptance practice》
《钢筋焊接及验收规程》..................................................(JGJ18-2003) 《uniform standard for building works’ quality acceptance》
《建筑工程施工质量验收统一标准》........................................(GB50300-2001) 《Building’s ground works’ quality and acceptance norm》
《建筑地面工程施工质量验收规范》........................................(GB50209-2002) 《Roof works technical specification》
《屋面工程技术规范》....................................................(GB50345-2004) 《Plumbing works’ construction and acceptance》
《给水排水管道工程施工及验收规范》..................................... (GB50268-2008) 三、 Construction principle 施工准备
Technical principle技术准备
The organization construction and technical personnel shall familiar with the drawings, construction
technology and technical standard; understand the design requirements to meet the technical standards, clear process.
组织施工技术人员熟悉图纸、施工工艺及有关技术规范,了解设计要求达到的技术标准、明确工艺流程。
The <<construction scheme>> which be prepared and approved shall be counted as the operation
instruction; Introduce the technology to constructor.
将编制好且通过审批的《施工方案》,向人员进行技术交底、组织人员学习。
Introduce the safety technique to workers; make full preparations for the security technology.
对施工人员进行安全技术交底,做好充分的安全技术准备工作。
Know the current situation of construction site. Setting out according to requirement and inspect the complex line.
了解施工现场的现状。根据要求放线,并经检查复线。
Because of complex building, substation construction personnel and equipment on the basis of cross operation, engineering construction should include safety as a focus of the work, at the construction site
range, according to the relevant provisions of the safe and civilized construction erection of temporary safety fence, hanging safety warning signs.
因综合楼、变电所施工人员与设备基础交叉调度作业,工程 …… 此处隐藏:25822字,全部文档内容请下载后查看。喜欢就下载吧 ……