Abstract

Foundation Pit is the excavation of an underground space below the surface and a coordinated support system. Bracing of foundation pit is to ensure that excavation and foundation construction for the smooth and safe environment Foundation Pit and used the pit retaining wall reinforcement and protection.

Bracing of Foundation Pit structure is the structural safety of temporary reserves are smaller, more risk. Foundation pit structure has a strong regional. Excavation works under different hydrological environmental and geological conditions are vastly. Effects complex excavation, excavation pit is not only necessary to ensure their own safety,but also to effectively control the pit surrounding strata.

First,the paper introduces the general engineering situation of Zaoyuan Station,Including hydrological geology and the environment,Then,based on the existing foundation pit excavation method and station actual situation select the suitable for the station of the excavation and support scheme。And then, through the soil pressure calculation, structure calculation, reinforcement, checking, support design, deformation estimation ,then made a theoretical analysis of the data for the excavation of foundation pit supporting。Finally , through the construction organization describes the construction process of the method and the problem which should be noted.

KEY WORDS: Supporting scheme, the Underground continuous wall, Support, Construction organization design

城市地下空间工程专业毕业论文(3).doc 将本文的Word文档下载到电脑

精彩图片

热门精选

大家正在看

× 游客快捷下载通道(下载后可以自由复制和排版)

限时特价:7 元/份 原价:20元

支付方式:

开通VIP包月会员 特价:29元/月

注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信:fanwen365 QQ:370150219